Project Category: Marine Projects

Dredging Works At Bardawil Lake

• Project description :

• Dredging 10,000,000 m3

• The project owner: Suez Canal Authority
• Supervision : Suez Canal Authority

Dredging Works At Edku Lake

• Project description :

• Dredging 30,000,000 m3

• The project owner: Suez Canal Authority
• Supervision : Suez Canal Authority

Dredging Works At Manzala Lake

• Project description :

• Dredging 96,000,000 m3 in El Manzala Lake in three Contracts

• The project owner: Suez Canal Authority
• Supervision : Suez Canal Authority
• Contract Date : 2019

East Area of Izbat Al –Bourj at Damietta

• Project description :

• constructing sea wall with length 3 Km by excavation up to –(6.00) then laying geotextile and making stone layers
with different weights (10 – 100) Kg , (10-200) Kg and (500-1500) Kg then Dolos Layers with weight 5 tons.

• The project owner: The Egyptian authority for shore protection
• Supervision : The Egyptian authority for shore protection
• Project Duration : 30 Months
• Contract Date : 2020

Eastern Break water Rehabilitation at San Stefano – Four Seasons Hotel

• Project description :

• project consist of Protecting the Eastern Break water and the buildings on it with nature stones and blocks with different weights , Cubic concrete blocks weight 5 tons in the length of the bulkhead with different distances averaging 7 meters, some blocks are stacked in two or three rows and some blocks are randomly located and Cubic concrete blocks weighing 14 , 20 tons at the head area and at different distances averaging 15 meters.

• The project owner: Talaat Mustafa Group
• Supervision : Dr/Ahmed Sobhy
• Project Duration : 8 Months
• Contract Date : 12/9/2020

Palm Hills Shore Protection

• Project description :

• The project consist of three submerged breakwaters eastern , northern and western with length 188 m , 450 m and 160 m respectively

• The project owner: Palm Hills Company.
• Supervision : Palm Hills Company.
• Project Duration : 16 Months
• Contract Date : 2016

Ras El-Bar Shore Protection

• Project description :

• Constructing sea wall 90 m length from stone and sea wall 450 m length from Dolomite , the main layer protection from Dolos weight 6 ton and fill behind breakwater with sand to create area with 24000 m2 ,Constructing submerged breakwater 250 m length and main layer protection from Dolos weight 4 ton ,Supporting 8 break waters with Dolos weight 6 ton using marine equipment (Benton and tug boat).

• The project owner: The Egyptian authority for shore protection
• Supervision : The Egyptian authority for shore protection
• Project Duration : 2 Years
• Contract Date : 8/8/2010

Borolos shore protection

• Project description :

• Constructing sea wall 1450 length consists of two layers from Dolomite stones with different weights and main layer protection from Dolos weight 2 ton ,constructing sea wall with length 550 m same layer as before but main layer protection from the modified cube weight 2 ton.

• The project owner: the Egyptian authority for shore protection.
• Supervision : The Egyptian authority for shore protection.
• Project Duration : 2 Years (During Contract Duration and no late in Executing)
• Contract Date : 19/10/2009

Mustafa Kamel Club Shore Protection – Alexandria

• Project description :

• The project consists of Marine Quay from Concrete Blocks with length 50 m and 8 m depth, main breakwater 335 m length, and submerged breakwater 240 m length.

• The project owner: Navy forces
• Supervision : Naval Engineering Division
• Project Duration : 2 Years (During Contract Duration and no late in executing)
• Contract Date : 24/2/2014

The series of submerged breakwaters At Sidi Bishr

• Project description :

• Constructing break water from crushed stones 600 m length and Marine Quay wall
from concrete Blocks with length 125 m orthogonal the shore line and 30 m parallel to the shore line

• The project owner: The Egyptian authority for shore protection
• Supervision : The Egyptian authority for shore protection
• Project Duration : 2 years
• Contract Date : 31/10/2017