Project Category: Marine Projects

• The project owner: Suez Canal Authority

East Area of Izbat Al –Bourj at Damietta
• Project description :
• constructing sea wall with length 3 Km by excavation up to –(6.00) then laying geotextile and making stone layers
with different weights (10 – 100) Kg , (10-200) Kg and (500-1500) Kg then Dolos Layers with weight 5 tons.
• The project owner: The Egyptian authority for shore protection
• Supervision : The Egyptian authority for shore protection
• Project Duration : 30 Months
• Contract Date : 2020

Eastern Break water Rehabilitation at San Stefano – Four Seasons Hotel
• Project description :
• project consist of Protecting the Eastern Break water and the buildings on it with nature stones and blocks with different weights , Cubic concrete blocks weight 5 tons in the length of the bulkhead with different distances averaging 7 meters, some blocks are stacked in two or three rows and some blocks are randomly located and Cubic concrete blocks weighing 14 , 20 tons at the head area and at different distances averaging 15 meters.
• The project owner: Talaat Mustafa Group
• Supervision : Dr/Ahmed Sobhy
• Project Duration : 8 Months
• Contract Date : 12/9/2020

Ras El-Bar Shore Protection
• Project description :
• Constructing sea wall 90 m length from stone and sea wall 450 m length from Dolomite , the main layer protection from Dolos weight 6 ton and fill behind breakwater with sand to create area with 24000 m2 ,Constructing submerged breakwater 250 m length and main layer protection from Dolos weight 4 ton ,Supporting 8 break waters with Dolos weight 6 ton using marine equipment (Benton and tug boat).
• The project owner: The Egyptian authority for shore protection
• Supervision : The Egyptian authority for shore protection
• Project Duration : 2 Years
• Contract Date : 8/8/2010

Borolos shore protection
• Project description :
• Constructing sea wall 1450 length consists of two layers from Dolomite stones with different weights and main layer protection from Dolos weight 2 ton ,constructing sea wall with length 550 m same layer as before but main layer protection from the modified cube weight 2 ton.
• The project owner: the Egyptian authority for shore protection.
• Supervision : The Egyptian authority for shore protection.
• Project Duration : 2 Years (During Contract Duration and no late in Executing)
• Contract Date : 19/10/2009

Mustafa Kamel Club Shore Protection – Alexandria
• Project description :
• The project consists of Marine Quay from Concrete Blocks with length 50 m and 8 m depth, main breakwater 335 m length, and submerged breakwater 240 m length.
• The project owner: Navy forces
• Supervision : Naval Engineering Division
• Project Duration : 2 Years (During Contract Duration and no late in executing)
• Contract Date : 24/2/2014