West of the Future Quay 1500 m length at Ras El Tin

• Project description :

• Constructing quay 1500 m length and 14 m depth ,The berth consists of ( compound section steel pipes and sheet piles) ,The pipes depth 32.00 m under sea water ,The pile cap constructed and provided with all the necessary accessories (fenders, bollards and marine ladders(.

• The project owner: Navy Forces
• Supervision : Naval Engineering Division
• Project Duration : 1 year
• Contract Date : 23/1/2018