West of the Future Quay 1500 m length at Ras El Tin
HomeWest of the Future Quay 1500 m length at Ras El Tin
• Project description :
• Constructing quay 1500 m length and 14 m depth ,The berth consists of ( compound section steel pipes and sheet piles) ,The pipes depth 32.00 m under sea water ,The pile cap constructed and provided with all the necessary accessories (fenders, bollards and marine ladders(.
• The project owner: Navy Forces • Supervision : Naval Engineering Division • Project Duration : 1 year • Contract Date : 23/1/2018