The series of submerged breakwaters At Sidi Bishr

• Project description :

• Constructing break water from crushed stones 600 m length and Marine Quay wall
from concrete Blocks with length 125 m orthogonal the shore line and 30 m parallel to the shore line

• The project owner: The Egyptian authority for shore protection
• Supervision : The Egyptian authority for shore protection
• Project Duration : 2 years
• Contract Date : 31/10/2017