• The project consists of constructing quays with a length of 12 km and a depth of 18 m , with Circulation yards and commercial , logistical areas of 5.3 km2 served by a network of railways with a length of 10 km linked to the high-speed electric train El-Sokhna / New Alamein , Quay Length 970 m .
• The project owner: Ministry of Transportation • Supervision : AlDAR For Consulting Engineering • Project Duration : 2 years