NORTH COAST Highway Paving Works

• Project description :

Paving of the coastal road (11.5 km length at Hammam Sector). Constructing and Expansion of
Asphalt roads at Hammam Sector 11.5 km length , The new road consists of 6 lanes with 3.5m width each other and a total
width equal 21m and island 5 m. expansion of steel bridges on drain 3200 km , and expansion of concrete bridge on drain
3850 km.

• The project owner : Northern Military Region.
• Supervision : Northern Military District Engineering Division.
• Project Duration : 18 Month ( During contract duration and no late in executing)
• Contract Date : 2016