• Project consist of constructing the Eastern Break water with a length of 2.05 km the commercial Quay-wall with a length of 4200 meters, with depth of 17.5 M
• The project owner: Egyptian Government under supervision of Egyptian Naval Force • Project Duration : 24 MONTHS