El-Mistral Quay 700 m length and 14 m depth

• Project description :

• Constructing quay of 700 m length and 14 m depth ,The quay consists of (CFA piles and compound section steel pipes and sheet piles) ,The pipes depth (32.00) m under sea water level ,The pile cap constructed on 175000 m2 provided with all the necessary accessories (fenders, bollards and marine ladders) ,Addition to make the needed landscape for the project area.

• The project owner: Navy Forces
• Supervision : Naval Engineering Division
• Project Duration : 18 Months (During Contract Date and no late in executing)
• Contract Date : 15/6/2016