Alexandria Grand Port (Northern Breakwater)

• Project description :

• The project consist of breakwater with a length of 2200 m – removal of the existing barrier / removal of the barrier of pier 100 / removal of a barrier in Alexandria port

• The project owner: Alexandria port authority – ministry of transport
• Project Duration : 18 MONTHS