• Project description :
• The project consist of constructing the Eastern Breakwater with a length of 1.4 km , the Central Breakwater with a length of 1.5 km & Northern Breakwater with a length of 2.145 km .
• The project owner: Ministry of transport – Alexandria port Authority • Project Duration : 18 MONTHS