Abu Zekri Axis ( G Bridge )

• Project description :

The bridge consists of (27) axis. The length of the bridge is (673) meters and a width of (18.7) meters per direction.
Total bridge length: 1346 m
• The total number of PILES (446) PILES- 1 (414) PILES Qatar 1 m -2 (32) PILES Qatar 1.5 m (85) base .

(173) columns and (41) parts – (56) as a predecessor, the total number of beams, the total number of beams (252)- (196) as a predecessor of stress

• The project owner : Armed Forces Engineering Authority (Northern Region)
• Supervision : Al-Raed Engineering Consulting Office
• Project Duration : 6 Months
• Contract Date : 2022