• The bridge consists of (2) axles • The length of the bridge is (50) meters and its width is (33)meters • The total number of piles is (10) pile • It consists of (2) bases, (2) walls & (8) Metal camera • The project owner : Armed Forces Engineering Authority • Supervision : Al-Raed Engineering Consulting Office • Project Duration : 6 Months • Contract Date : 2021