• constructing sea wall with length 3 Km by excavation up to –(6.00) then laying geotextile and making stone layers with different weights (10 – 100) Kg , (10-200) Kg and (500-1500) Kg then Dolos Layers with weight 5 tons.
• The project owner: The Egyptian authority for shore protection • Supervision : The Egyptian authority for shore protection • Project Duration : 30 Months • Contract Date : 2020