Eastern Break water Rehabilitation at San Stefano – Four Seasons Hotel

• Project description :

• project consist of Protecting the Eastern Break water and the buildings on it with nature stones and blocks with different weights , Cubic concrete blocks weight 5 tons in the length of the bulkhead with different distances averaging 7 meters, some blocks are stacked in two or three rows and some blocks are randomly located and Cubic concrete blocks weighing 14 , 20 tons at the head area and at different distances averaging 15 meters.

• The project owner: Talaat Mustafa Group
• Supervision : Dr/Ahmed Sobhy
• Project Duration : 8 Months
• Contract Date : 12/9/2020