• Project description :
• project consist of Protecting the Eastern Break water and the buildings on it with nature stones and blocks with different weights , Cubic concrete blocks weight 5 tons in the length of the bulkhead with different distances averaging 7 meters, some blocks are stacked in two or three rows and some blocks are randomly located and Cubic concrete blocks weighing 14 , 20 tons at the head area and at different distances averaging 15 meters.
• The project owner: Talaat Mustafa Group • Supervision : Dr/Ahmed Sobhy • Project Duration : 8 Months • Contract Date : 12/9/2020