HomeMustafa Kamel Club Shore Protection – Alexandria
• Project description :
• The project consists of Marine Quay from Concrete Blocks with length 50 m and 8 m depth, main breakwater 335 m length, and submerged breakwater 240 m length.
• The project owner: Navy forces • Supervision : Naval Engineering Division • Project Duration : 2 Years (During Contract Duration and no late in executing) • Contract Date : 24/2/2014