Mustafa Kamel Club Shore Protection – Alexandria

• Project description :

• The project consists of Marine Quay from Concrete Blocks with length 50 m and 8 m depth, main breakwater 335 m length, and submerged breakwater 240 m length.

• The project owner: Navy forces
• Supervision : Naval Engineering Division
• Project Duration : 2 Years (During Contract Duration and no late in executing)
• Contract Date : 24/2/2014