• Creating new transverse axes linking the East Nile to the West Nile • The bridge consists of (4) axes • The length of the bridge is (150) meters and a width of (31) meters • The total number of PILES (32) PILES (16) PILES Qatar 1 m -2 (16) PILES Qatar 1.5 m • It consists of (20) columns, (4) parts ,(20) as a precedent casting & (10) as a metal heptanoate • The project owner : The Engineering Authority of the Armed Forces • Supervision : Muharram Bakhoum’s office • Contract Date : 2022