26th of July Axis (Princesa Bridge)

• Project description :

The bridge consists of (5) axes The length of the bridge is
(150) meters and its width is (33) meters .
The total number of piles is (34) piles It consists of a number (6) bases .
It consists of a number (16) columns It consists of a number (5) Frame consists of (28)
pre-cast beams consists of (8) metal beams

• The project owner : Armed Forces Engineering Authority
• Supervision : Al-Raed Engineering Consulting Office
• Project Duration : 6 Months
• Contract Date : 2021