Construction of the Hammam Canal Project – Desert Sector from 900 + 106 to 440 + 109 to collect agricultural drainage water to irrigate 362 thousand acres.
• Construction of the Hammam Canal sector, 2.5 km long and 70 m wid • The project owner : Engineering Authority, 19th Brigade, 3rd Battalion Roads • Supervision: Envir & Infra str. Studies • Project Duration : Year • Contract Date : 2021