Construction El Hammam Canal

• Project description :

Constructed Canal
With 52 KM length and 16 M width
then road on the left with 10M width &
dirt road on the right with width 8 m

• The project owner : Armed Forces Engineering Authority
• Supervision: HYDRO
• Project Duration : 4 Months
• Contract Date : 2021