Paving of the coastal road (11.5 km length at Hammam Sector). Constructing and Expansion of Asphalt roads at Hammam Sector 11.5 km length , The new road consists of 6 lanes with 3.5m width each other and a total width equal 21m and island 5 m. expansion of steel bridges on drain 3200 km , and expansion of concrete bridge on drain 3850 km.
• The project owner : Northern Military Region. • Supervision : Northern Military District Engineering Division. • Project Duration : 18 Months • Contract Date : 2022